Practice of Project Management Methodology for Commercial Aero-engines Based on Integrative Project Architectures
Article
Figures
Metrics
Preview PDF
Reference
Related
Cited by
Materials
Abstract:
To collect and share information of projects or products and make it consistent and correct so that the quality and costs of projects can be effectively controlled, an integrative project architecture integrating different types of breakdown structures is necessary. In this paper, the international research status on work breakdown structure (WBS) was analyzed, and an integrative project architecture for commercial aero-engines was designed, where product breakdown structure (PBS), WBS, organization breakdown structure (OBS) and cost breakdown structure (CBS) were integrated and built. And the architecture was applied in information systems. A transfer from technological views of complex products through their lifecycles to management views has been realized with this standardized architecture, thus development tasks and costs can be controlled.
Keywords:
Project Supported:
(3) Organization breakdown structure (OBS): OBS is to solve who will be responsible for specific work packages, assign team units to various project levels and define responsibilities.
ZHANG Yujin, LIAO Wenhe. Practice of Project Management Methodology for Commercial Aero-engines Based on Integrative Project Architectures[J]. Transactions of Nanjing University of Aeronautics & Astronautics,2020,37(2):311-321